Our Facility
AR Fabrication is located in a brand new state-of-the-art 6,500 Square Foot facility located in Winchester, VA.
Equipment List
- In-Ground AWD DynoJet
- Miller Syncrowave Tig Welder
- Lincoln Mig Welder
- Hydraulic Tubing Bender
- Tubing Notcher
- Sheet Metal Box Brake and Shear
- Sheet Metal Shrinker/Stretcher
- Electric bead roller with 42" throat (very big)
- Engine Building Clean Room, Stocked with Precision Tools
- Office and Display Area
- Large 2-Stage Air Compressor
- NX nitrous filling station
- 4 Post Lift
Home | ©Copyright 2005


